Free Trade & Contractor Job Price Calculator

Free Handyman Job Price Calculator

What Should You Charge For The Job?

Build a professional job price using your labour, materials, additional workers, travel costs, business overheads, markup and local tax — so you can quote with confidence instead of guessing.

Build Your Job Price

Enter the expected cost of completing the job. We'll calculate a recommended selling price that covers your costs, your labour, your chosen markup and any local tax you need to charge.

Enter all amounts using the currency you select.
Your Labour

Enter your own expected working time and the hourly labour rate you want included in the price.

Include the hours you expect to personally spend working on the job.
£
Enter the hourly amount you want included in the selling price for your own labour.
Additional Workers / Labour

Add employees, labourers or helpers separately. Each worker can have a different hourly rate and number of hours.

Total additional worker cost £0.00
Materials & Job Costs

Enter the direct costs you expect to incur while completing the job.

£
Enter what the materials will actually cost you.
%
Optional markup added specifically to your material cost for sourcing, handling and supplying materials.
£
Fuel, mileage, parking, tolls or other travel-related costs.
£
Waste disposal, equipment hire, subcontractors, permits, specialist consumables or other direct expenses.
Overheads & Job Markup

Add an allowance for running your business, then apply your desired markup to the total job cost.

%
Helps contribute towards insurance, tools, vehicle costs, advertising, software and other business expenses.
%
This percentage is added to the job cost after labour, materials and overheads have been included. For example, a 20% markup adds 20% to the calculated job cost.
Local Tax / VAT / Sales Tax

If you need to charge VAT, sales tax, GST or another local transaction tax, enter your local percentage below.

%
For example: enter 20 for 20% VAT, 10 for 10% GST or 8.25 for an 8.25% sales tax. Enter 0 if no tax applies.
Important: The tax field is intended for VAT, GST, sales tax or similar tax added to the customer's bill. It is not intended to calculate your personal or business income tax.

Your Recommended Job Price

This shows the suggested selling price based on your labour, workers, materials, business overhead, job markup and local tax.

Enter your figures above and click Calculate My Recommended Price to see your full pricing breakdown.
Handyman Hub Pro Tool

Ready to Turn This Job Into a Professional Quote?

You've worked out what the job should cost. Now turn that figure into a professional branded quote or invoice you can save as a PDF and send straight to your customer.

Quote & Invoice Generator

Create professional business documents in your browser without paying for expensive monthly invoicing software.

Upload Your Own Business Logo
Create Professional Quotes
Create Professional Invoices
Add Customer & Business Details
Itemise Labour, Materials & Services
Optional VAT / Sales Tax
Add Payment Terms & Notes
Choose Which Sections Appear
Save Your Business Details
Print or Save as PDF
One simple payment
$4.99
LIFETIME ACCESS

Use the online Quote & Invoice Generator whenever you need it. Nothing to download, no monthly subscription and no charge each time you create a document.

Create My First Quote →
$4.99 once • Lifetime access • No subscription
Your recommended job price above £0.00
From Job Price to Professional Quote in Minutes
1
Buy Access
2
Add Your Logo
3
Enter Job Details
4
Save Your PDF

How to Price Handyman, Trade & Contractor Jobs Properly

Knowing what to charge for a handyman, trade, construction or contractor job can be difficult when labour, materials, workers, travel, overheads, markup and tax all need to be considered.

A job price that looks reasonable at first can quickly become too low once every cost involved in completing the work is taken into account.

The Trade & Contractor Job Price Calculator above is designed to help handymen, tradespeople, construction professionals and small contractors build a suggested customer price from the ground up instead of relying on guesswork.

You can enter your own labour rate, add workers with different hourly rates, include material markup, allow for business overheads, choose an overall job markup and add local VAT, GST or sales tax where required.

1

Calculate Your Labour Cost

Start by estimating how many hours you expect to personally spend completing the work and multiply those hours by the hourly labour rate you want included in the price.

This applies whether you are pricing a handyman repair, a trade job, a construction task or a small contracting project.

2

Add Workers & Direct Job Costs

If employees, labourers, helpers or other tradespeople are involved, their cost should also be included in the job price.

Materials, travel, parking, disposal fees, equipment hire and other direct costs should all be considered before applying your final markup.

3

Allow for Business Overheads

Every job needs to contribute towards the wider cost of running your trade or contracting business.

Insurance, vehicles, tools, advertising, software, administration and other operating expenses still need to be paid even when they are not shown separately on the customer's quotation.

4

Add Job Markup & Local Tax

Once your expected job costs have been calculated, you can apply a percentage markup to arrive at your recommended selling price.

VAT, GST, sales tax or other local transaction taxes can then be added separately where applicable.

Example: Pricing a Small Trade or Contractor Job

Imagine you are pricing a one-day repair, installation or construction job that includes your labour, materials, travel and an allowance towards your business overheads.

Example Job Price
Your labour £400
Materials + markup £240
Travel / other costs £60
Base job cost £700
10% overhead £70
Cost before markup £770

If you then apply a 25% job markup, £192.50 is added, producing a recommended pre-tax selling price of £962.50.

If 20% VAT or an equivalent local tax applies, £192.50 is added in tax, producing a final customer price of £1,155.00.

What Is Job Markup in Construction and Trade Work?

Job markup is a percentage added to the calculated cost of delivering the work.

For example, if a contractor calculates that a job costs £1,000 after labour, materials and overheads, adding a 20% markup adds £200 and produces a selling price of £1,200 before tax.

Markup is often easier to work with than profit margin when building trade or construction quotations because the calculation is direct: calculate the cost, then add a percentage on top.

Should Handymen and Contractors Mark Up Materials?

Many handyman, trade and construction businesses add a markup to materials instead of supplying them at exactly the purchase price.

Supplying materials can involve additional work and risk beyond the price shown on the supplier's invoice.

  • Finding and comparing suitable products.
  • Ordering or collecting materials.
  • Fuel and travel time associated with collection.
  • Handling shortages, returns or damaged materials.
  • Carrying the cost of unused or leftover stock.
  • Arranging specialist products or deliveries.

The calculator therefore allows you to enter a separate material markup before the overall contractor or job markup is calculated.

How Should Additional Workers Be Included in a Job Price?

Construction and trade jobs often involve more than one person. Labourers, helpers, skilled tradespeople or subcontractors may all work different hours and have different hourly costs.

For example, one worker completing eight hours at £25 per hour costs £200, while another completing five hours at £18 per hour costs £90. The combined additional worker cost is £290.

The calculator allows workers to be entered individually so each person's actual rate and hours can be reflected in the quotation.

What Overheads Should a Tradesman or Contractor Include?

Pricing only for labour and materials can leave a trade or construction business without enough revenue to cover its wider operating costs.

Typical business overheads may include:

  • Van purchase, finance, fuel, servicing and repairs.
  • Public liability and other business insurance.
  • Tools and equipment replacement.
  • Mobile phone and internet costs.
  • Website, advertising and lead generation.
  • Software, bookkeeping and accountancy.
  • Protective equipment and work clothing.
  • Training, licences and certifications.
  • Non-billable administration and quoting time.

The overhead percentage in the calculator provides a simple way to add an allowance towards these costs when pricing each job.

How Do You Price a Small Construction Job?

Small construction jobs can be priced using the same basic principles as handyman and trade work.

Estimate the labour required, include materials and additional workers, add direct expenses such as travel or equipment hire, allow for business overheads, then apply your chosen contractor markup.

This approach can be useful for repair work, installations, maintenance, joinery, decorating, flooring, landscaping, refurbishment and other small construction projects.

How Do Contractors Calculate a Job Price?

A contractor job price should normally be based on the expected cost of delivering the work rather than simply copying a competitor's rate.

The total can include your own labour, employees or subcontractors, materials, equipment, travel, overhead allowance and markup.

This gives you a clearer understanding of how the final customer price has been built and makes it easier to adjust the quote when the scope of work changes.

How Does VAT, GST or Sales Tax Affect Contractor Pricing?

VAT, GST and sales tax rules differ between countries and, in some places, between states, provinces or local areas.

Where a transaction tax applies to the customer invoice, it is normally useful to calculate the underlying selling price first and then add the applicable tax separately.

The calculator lets you enter your own local tax percentage instead of assuming one tax rate applies to every handyman, tradesperson or contractor.

Enter 0% if no transaction tax needs to be added.

Contractor Markup vs Profit Margin: What's the Difference?

Markup and profit margin are related, but they are not the same calculation.

Markup is calculated as a percentage of cost. If a construction job costs £1,000 and you add a 25% markup, the selling price becomes £1,250.

Profit margin is calculated as a percentage of the final selling price. This means a 25% markup does not create a 25% profit margin.

This calculator uses markup because it is generally easier to understand when building a handyman, trade or contractor quotation from expected job costs.

Common Trade & Contractor Pricing Mistakes

Underpricing does not always happen because an hourly rate is too low. Important costs can simply be missed when preparing the quotation.

  • Forgetting to include additional workers or subcontractors.
  • Charging materials at cost without allowing for sourcing time.
  • Ignoring fuel, parking or disposal fees.
  • Forgetting equipment hire or specialist consumables.
  • Making no allowance for business overheads.
  • Applying too little markup for unexpected costs.
  • Forgetting required VAT, GST or sales tax.
  • Guessing a price based only on what another contractor charges.

Who Can Use This Job Price Calculator?

The calculator can be used by many types of self-employed tradespeople, small construction businesses and contractors.

  • Handymen and property maintenance businesses.
  • Builders and small construction contractors.
  • Joiners and carpenters.
  • Painters and decorators.
  • Plumbers and electricians.
  • Flooring and tiling contractors.
  • Landscapers and exterior contractors.
  • Repair and refurbishment businesses.
  • General tradespeople and independent contractors.

Trade, Handyman & Contractor Job Pricing FAQs

Common questions about construction pricing, contractor markup, labour costs, materials, overheads and tax.

How do I price a handyman, trade or contractor job?

Start by calculating your labour, additional workers, materials and other direct job costs. Add an allowance towards business overheads, then apply your chosen job markup. Add any required VAT, GST or sales tax afterward.

How do I calculate labour cost for a construction job?

Multiply the expected number of working hours by the hourly labour rate for each person working on the job.

If different workers have different rates, calculate each worker separately and then add the labour costs together.

Can I add several workers at different hourly rates?

Yes. The calculator allows additional workers to be entered individually so their hourly rates and hours can be different.

What markup should a contractor add to a job?

There is no single markup percentage that is appropriate for every contractor or trade business.

The amount required can depend on operating costs, skill level, demand, competition, job complexity, warranty risk and the likelihood of unexpected expenses.

Is material markup different from contractor markup?

Yes. Material markup is added specifically to the purchase cost of materials. The overall job markup is then applied after labour, materials, direct job costs and the overhead allowance have been taken into account.

Can I use this calculator for construction jobs?

Yes. It can be used for small construction, repair, refurbishment, installation and maintenance jobs where you want to build a price from labour, materials, workers, overheads and markup.

Does the calculator include VAT, GST or sales tax?

Yes. You can enter your own local transaction tax percentage and the calculator adds it after the recommended pre-tax selling price has been calculated.

Does the calculator work outside the UK?

Yes. You can choose from GBP, USD, EUR, CAD, AUD and NZD and enter your own local VAT, GST, sales tax or equivalent percentage where applicable.

Does the calculator calculate income tax?

No. The tax field is designed for VAT, GST, sales tax or similar transaction taxes added to the customer's bill.

Personal income tax or business profit tax depends on wider annual income, allowable expenses, business structure and local tax rules.

Should contractors include overheads in every job price?

Your quotation does not necessarily need to show a separate overhead charge, but your pricing needs to generate enough revenue overall to contribute towards the wider cost of running the business.

Can I use this calculator before sending a customer quote?

Yes. Enter your expected labour, workers, materials, travel and other costs, choose your overhead and markup percentages, then use the recommended price as a starting point when preparing your customer quotation.

Disclaimer: This job pricing calculator and guide are provided for general informational purposes only. They are not financial, accounting, legal or tax advice. Labour rates, business costs, markup requirements, taxes and pricing rules vary by trade, business and location. Always check the requirements that apply to your own business before issuing a customer quotation.